Our administrative office is closed. We will return messages upon our return on Thursday, January 2 at 7:30 AM. We will have limited campus support. If you have an urgent facility concern which poses a threat to human or research safety, please call us at (951) 827-4214 and press 2 to speak with our Central Plant operators. Wishing you a wonderful winter break!
Scheduled Outages
Contact Us: (951) 827-4214 or facilities@ucr.edu Hours: 7:30 AM - 4:30 PM, Mon - Fri After Hours & Holiday Emergencies: (951) 827-4677
Facilities Services is dedicated to informing the campus community of scheduled outages that occur on campus. This information is accurate and reliable, but may change. Please inform all persons in your department who might be affected by the scheduled outages. If additional information is required, contact Facilities Services at (951) 827-4214 / facilities@ucr.edu.
Want to know when your building will have an outage? Subscribe or unsubscribe to our Building Contact Notification Distribution List.
subscribe/unsubscribe — Outage notifications
Scheduled utility outages and shutdowns:
DATE/TIME | PLACE | SCOPE OF WORK | IMPACT | CONTACT |
---|---|---|---|---|
Every Tuesday |
See the building schedule | NFPA code 110 testing — generator maintenance | See impact details |
Anthony Morris Client Support Services |
Thursday, December 26 until Thursday, January 2 | Athletics & Dance Building | There was a flood from a tree planter next to the building. The water line was able to be secured, however it is a domestic water line supplying the building. |
All domestic water is off to the building, which impacts all restrooms, showers, break room sinks, drinking fountains, and custodial sinks. |
Steve Crook Client Support Services
|
Monday, December 30 from 7:00 am to 5:00 pm | Corporation Yard | Contractors will be finishing the road asphalt on Linden Street with a topcoat. |
The Linden Street path into the south gate of the Corporation Yard will be closed. The fueling station can be accessed from the north gate on Watkins Drive. |
Chad Chambers Client Support Services |
Saturday, January 11 from 6:00 am to 6:00 pm |
Geology Building Marlan & Rosemary Bourns Hall Pierce Annex Science Laboratories 1 |
Connect new switches to support load balancing. |
The main power will be turned off to the buildings. Electrical equipment, lights, and elevators will be impacted. It is recommended that any equipment using emergency power be plugged into a red outlet, such as -80 freezers, spectrometers, and air compressors. All at-risk equipment should be plugged into surge protectors. |
John Franklin Kirk Quash Client Support Services |
Saturday, January 11 at 6:00 am to Monday, January 13 at 10:00 am | Marlan & Rosemary Bourns Hall | The deionized water distribution skid will be down due to a scheduled electrical shutdown on Saturday, January 11. An outside vendor will be required to restart the unit. | All deionized water will be off to the building and will impact equipment and research requiring deionized water. | Steve Crook Lead Plumber (951) 827-7696 / steve.crook@ucr.edu Client Support Services |
For Facilities Services/PDC Staff Only: Request a Utility Outage or Shutdown Notification
*Note – this form does not replace the formal USR process.
For Facilities Services Staff Only: Lock Out Tag Out Form and Smartsheet.